ALP-Ippon-Saipem-LOGGS-JUN21.JPG
Arrow down
Arrow previous Arrow next

PROJECT DURATION

30 DAYS

Transit time Transit time vertical

AREA OF OPERATION

Offshore Able Seaton UK-LOGGS location

Offshore support, barge towage, related to decommissioning of the Lincolnshire Offshore Gas Gathering System (LOGGS)

PROJECT

LOGGS decommissioning

CLIENTS

Saipem / Chrysaor

SCOPE OF WORK

Offshore support, barge towage, related to decommissioning of the Lincolnshire Offshore Gas Gathering System (LOGGS)

VESSEL(S) INVOLVED

ALP Ippon

198mt BP